BeginnerLesson 4 of 305 min read

Pricing Basics and Your Rate Floor

Work out your rate floor from costs, target pay and billable hours, price a project with a buffer, see how overruns cut your hourly pay and use value only as a gentle check.

In this lesson you will

  • Compare hourly, project and value pricing
  • Work out a rate floor
  • See what overruns do to your pay
  • State a price with confidence

About 24 minutes

Dev is asked, “How much do you charge?”

The cafe owner asks Dev for a price, and Dev freezes. Too low and the work is not worth doing. Too high and the owner says no. Pricing feels like guessing, but it can start from sums. This lesson gives you a floor, which is the lowest price you can accept, and shows what happens to it when a job takes longer than planned.

Three ways to charge

  • By the hour. Simple and fair when the work is hard to predict. The client may worry about the final bill.
  • By the project. One agreed price for a defined job. Clients like knowing the total. You carry the risk if the job takes longer.
  • By value. A price linked to what the work is worth to the client. It needs careful thought and suits more experienced freelancers.

Find your hourly floor

Start from what you need. Add your monthly costs, such as software, a phone plan and a share of equipment, to the pay you want. Then divide by your billable hours, the hours you can charge for. Not every hour is billable. Finding clients, replying to emails, doing your records and learning all take time that nobody pays for. The program below uses made-up numbers in sample money units: costs of 120, target pay of 1,500, 120 hours available a month and 55 per cent of them billable.

# MADE-UP numbers in sample money units
costs, pay = 120, 1500
available, billable_share = 120, 0.55
billable = available * billable_share
floor = (costs + pay) / billable
print("billable hours a month:", billable)
print("hourly floor:", round(floor, 2))

estimate, buffer = 10, 0.20
fee = round(estimate * floor * (1 + buffer))
print("project fee:", fee, "for", estimate, "hours estimated")
for actual in (10, 12, 14):
    print(f"if it takes {actual} hours: {fee / actual:.2f} an hour")

hours_to_floor = fee / floor
print("hours the fee covers at the floor:", round(hours_to_floor, 1))

# a value check: what might the work be worth to the client?
extra_orders_a_month, value_per_order = 2, 30
gain = extra_orders_a_month * value_per_order * 12
print("client gain in a year:", gain)
print("fee as share of that gain:", f"{fee / gain:.0%}")
billable hours a month: 66.0
hourly floor: 24.55
project fee: 295 for 10 hours estimated
if it takes 10 hours: 29.50 an hour
if it takes 12 hours: 24.58 an hour
if it takes 14 hours: 21.07 an hour
hours the fee covers at the floor: 12.0
client gain in a year: 720
fee as share of that gain: 41%

That gives 66.0 billable hours a month and a floor of 24.55 an hour. The next block prices a project of 10 estimated hours with a 20 per cent buffer for surprises, giving a fee of 295. If the job takes exactly 10 hours, Dev earns 29.50 an hour. At 12 hours that falls to 24.58, right on the floor. At 14 hours it is only 21.07, well below it. The fee covers about 12.0 hours of work at the floor, and after that Dev is working for less than needed. This is the central risk of project pricing: overruns come out of your pay.

Protect yourself from overruns

  1. Estimate the hours honestly, and add a buffer for questions, changes and mistakes.
  2. Write down exactly what is included, as lesson 5 and lesson 6 show.
  3. Limit the rounds of changes, and say what extra work costs.
  4. Track your real hours so that your next estimate is better.
  5. If you often overrun, raise your estimate or your price, not your working hours.

A value check

The last lines give a different angle. Suppose a clearer website brings the cafe two more orders a month worth 30 each. Over a year that is 720. Dev’s fee of 295 is 41 per cent of that, which is a sensible share. Value thinking can show that a price is fair, but it can also mislead. Do not invent large gains to justify a big price, and never promise results you do not control. The client may get fewer orders. Use value as a gentle check, not as a promise.

Say your price with confidence

State the price plainly, with what it includes, and then stop talking. Do not apologise for it, and do not discount before anyone has asked. If a client truly cannot afford it, offer a smaller scope, for example fewer pages, rather than the same work for less. Your price is a statement about the value of your time, and your next client will hear it in your voice.

Common mistake: guessing a price

Pricing from what you think people will pay instead of what you need. You then discover that the job pays less than a part-time shop job. Work out the floor first, then add what the market and your experience support.

Sample data and not advice

All amounts are made-up sample money and not real prices or advice. Costs, tax and rates differ widely, so work from your own figures. Nobody can promise earnings, and this lesson is not financial advice.

Work out your own floor: add your costs to your target pay and divide by a realistic number of billable hours. Then price one small job and check what happens if it takes 40 per cent longer.

Practice for this lesson

Check what you learned

Five quick questions. Pick an answer and you will see straight away whether it is right and why.

What are billable hours?

  1. All hours in a day
  2. Hours of sleep
  3. Hours you can charge a client for
  4. Hours on social media

Admin and finding clients are usually not billable.

What does the rate floor come from?

  1. A friend’s guess
  2. A random number
  3. The client’s budget
  4. Costs and target pay divided by billable hours

It is the lowest hourly figure that meets your needs.

What happens to a fixed fee when a job overruns?

  1. Your hourly pay rises
  2. Your hourly pay falls
  3. Nothing changes
  4. The client pays more

The extra hours come out of your pay.

Why add a buffer to the estimate?

  1. To cheat the client
  2. To avoid tax
  3. Jobs often take longer than planned
  4. To shorten the job

A buffer covers questions, changes and mistakes.

What is value pricing a good use as?

  1. A gentle check, never a promise of results
  2. A way to invent big gains
  3. A way to avoid costs
  4. A legal rule

You cannot promise results you do not control.

Summary

  • Start from costs, pay and billable hours to find a floor.
  • A fixed fee puts the risk of overruns on you.
  • Add a buffer, limit the changes and track your hours.
  • State your price plainly and offer a smaller scope instead of a discount.

Next lesson

Lesson 5 shows how to write proposals and quotes.

Questions

Should I charge by the hour or by the project?

Hourly suits unclear work; project pricing suits well-defined work. Many beginners start with a project price built from an hourly estimate and a buffer.

What if my floor is higher than the market?

Check your costs and billable hours, choose clients who value the work, or build skills until the work is worth more. Do not simply work below your floor for long.

Are these numbers real?

No. They are made-up sample numbers in sample money units. Use your own costs and goals.

Progress is saved in this browser.